Randhawa directs for intensifying ongoing development, blacktopping works in Bahu Constituency

JAMMU, October 23: Vikram Randhawa, MLA Bahu Constituency, chaired a meeting of PWD officials of Satwari Division at the PWD Guest House here today. The meeting focused on reviewing the progress of ongoing development projects in the Bahu constituency.

During the meeting, senior officials, including the Superintendent Engineer (S.E.), Executive Engineer (XEN), Assistant Executive Engineer (AEE), and Assistant Engineer (AE) of PWD Satwari Division, were present.

Randhawa took stock of the current status of infrastructure development, particularly road projects, and discussed ways to expedite the completion of pending works.
Expressing serious concern over the deteriorating condition of roads in the constituency, Vikram Randhawa emphasized the need for immediate repair and blacktopping. He directed the PWD officials to intensify efforts and prioritize the improvement of road infrastructure, ensuring that the residents of Bahu do not face any inconvenience due to the poor condition of roads.
“BJP is committed to provide better infrastructure to the people of Bahu constituency. The ongoing development projects must be expedited, and all the roads should be blacktopped at the earliest to improve connectivity and convenience for the residents,” he stated.
The MLA assured the officials of full support and directed them to address any challenges that might be hampering the progress of development projects. He further urged them to maintain quality standards in the construction and repair works to ensure long-lasting infrastructure.
The meeting concluded with a renewed commitment to improving the infrastructure in Bahu Constituency and ensuring that all development projects are completed on time.

blacktopping works in Bahu Constituency
Comments (0)
Add Comment